Educational screen & audio-visual guide (c1956-1971])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

FACT: Jn the Southwest, at the time of construction of our first windowless building, conventiorud school construction cost $16.00 per square foot, windowless school construction $9.60 per .square foot. FACT: Analysis of heating and cooling costs indicates up to 40 percent greater efficiency in the windowless school (tests hy engineering consultant in this field). FACT: Only in such education structures can safe and constant lighting factors be maintained, almost ideally accommodated to prevent eyestrain on the part of the student (determined by professional consultants in this field). FACT: Partitions, doors and properly constructed walls give a minimum of 35 decibel noise reduction and provide audio environment with both proper intensity level and reverberation time. FACT: Maintenance costs are dramatically reduced due to drastically reduced window cleaning and replacement, and painting. Much less dust. FACT: Perfect audiovisual environment for teaching within the new media framework. FACT: Feared "claustrophobia" among sttidents failed to materialize. Among almost a dozen such structures currently in use in three communities in eastern New Mexico no such incidence has yet occured. To the contrary students display remarkable esprit de corps regarding their buildings. FACT: PTA groups in all three communities ■strongly endorse this type of building. Parents are enthusiastic about the buildings; most frequently heard remark— "I wish I could have gone to school in a building like this . . ." FACT: Faculties are extremely stable. In the Roswell City Schools requests for teacher-transfers from this type of building are extremely rare— an excellent endorsement of this type of facility. Requests for transfer to stich buildings are numerous, with the opinion of these neiv buildings rating high among teachers in the area of these cities. nities, and the architect and his consultants. The design criteria is predicated on the proposition that the process of learning and teaching can best be accomplished in a situation where the participants feel well, see well, and hear well. In our climate of temperature extremes and oc casional conditions of air-born dust, adequate, con plete and proper air conditioning is necessary to a complish the requirement of feeling well. Our extrem ly bright skies and sunshine require complete contr of lighting in order to provide a situation where pa ticipants can see well. And acoustical engineering a Another view of the El Capitan school in Koswell. 276 Educational Screen and Audiovisual Guide — June, 19