The vaudeville theatre, building, operation, management (1918)

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

very secure construction, as it is often required to carry a very heavy load. There should be 6 feet of headroom between gridiron and roof. The asbestos curtain of approved weight and construction, running in sheet iron runways, is now so universally required by law that pro- vision for one of these is not likely to be over- looked. Counterweighting and balancing it so that it runs easily, smoothly and noiselessly is, of course, essential. The asbestos curtain should be 2 feet larger each way, side and top, than the opening. The loading door should not be less than 8 feet wide by 16 feet high, with a smaller door inside the larger one, for use when it is not nec- essary to open the bigger door. Care should be taken that this is securely hung and swings freely when opened. The switchboard should be placed on the "prompt" side of the stage, its edge about 6 feet in from proscenium frame (if located on stage) and should stand 3 feet from the wall, with wall recessed behind it so as to pro- vide ample working space. It should be so lo- cated that the electrician can see the action tak- ing place "in one," through an opening which he will doubtless provide for that purpose, close to the wall, in the first entrance. In the larger 38