The vaudeville theatre, building, operation, management (1918)

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

can be removed without defacing plaster, mar- ble or woodwork. Conduits to be continuous from cut-out boxes to outlets, and of sufficient size to permit the easy insertion or withdrawal of wires, without injury to installation. All conduits to be free from burrs; to have water- tight, red-leaded joints; to be installed, so far as practicable, after floor beams are laid; fas- tenings to be about 4 feet apart and secured by approved straps. 6th: At each outlet, flush switch receptacle, etc., approved outlet boxes are to be set flush with plaster line. 7th: Fixture hangers to be installed at each bracket and ceiling outlet to be of suitable and safe type, of sufficient strength safely to sup- port the fixture to be installed. 8th: All wire used to be of hard grade cop- per, 98 per cent, conductivity, with high-grade, approved, rubber insulation. No wire smaller than No. 14 B&S gauge for circuits in front of curtain line, or No. 12 B&S gauge back of cur- tain line shall be used, and all wire larger than No. 8 B&S gauge shall be stranded. 9th: All work must comply in every respect with codes, city ordinances and with Under- writers' requirements. 10th: All temporary lighting and lights re- 46