The vaudeville theatre, building, operation, management (1918)

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

quired during construction and equipment to be furnished and maintained by the contractor during prescribed working hours; overtime as agreed upon. 11th: Contractor to pay all costs of secur- ing motor, lamp, wiring and installation inspec- tions by the city officials and Underwriter's representatives, and shall be responsible for se- ciu'ing from the necessary sources certificates showing approval of the installation, and the architect and builder shall not accept the in- stallation or consider contract completed until this has been done and the proper certificates turned over. 12th: All piping in front of curtain line to be concealed if possible, but on stage may be "open" or unconcealed. 13th: All panels to be of a specified gauge of metal, with self-closing doors fitted with snap locks and keys. Marbleized slate not less than one inch thick shall be used for mounting buss bars and switches; liberal wire-way gut- ters provided; bottom barrier to be set at an angle of 45 degrees to prevent bottom of cab- inet being used as receptacle for miscellaneous articles. 14th: Specifications to be carefully and com- pletely drawn by architect, checked by city elec- 47