Educational film guide ()

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

1949 EDITION 623.8 BULKHEAD: SETTING A TRANSVERSE WATERTIGHT BULKHEAD INTO HULL I — Continued Demonstrates the work of the shipwright In setting and fairing a watertight bulkhead into a hull. Considerable emphasis is given to the location of the center line, frame lines and buttock lines on the hull of the ship, the alignment of the same lines on the bulkhead to the hull lines, the technics used in shifting the bulkhead to bring it into the correct position, and the shoring of the bulkhead in position for fitting DECK GIRDERS: SUB-ASSEMBLY. Castle 1942 15min sd $26.43 623.8 sh-c-tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Portrays the work of the shipfltter in sub-assembling a deck girder. This demonstration gives considerable emphasis to the necessity for proper understanding and correct reading of the blueprint in order to lay out and fit a deck girder accurately, the purpose of a deck girder, the operations necessary to fit filler and tilting brackets A view of a ship under construction showing the deck girders in place provides a basis for the explanation DECK PLATES: REGULATING AND SETTING. Castle 1942 IGmin sd $27.88 623.8 sh-c-tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Shows the work of the shipfltter and the shipwright in setting, fairing, regulating, and fltting, the deck plates of a ship Emphasis is given to procedures used by the shipwright in setting and aligning deck plates, the work of the shipfltter in regulating and fltting the plates in their position, the use of a steamboat jack and angle bar clips and bolts for moving the plates are demonstrated DECK: SETTING A WEB FRAME AND A TRANSVERSE BEAM. Castle 1942 17min sd $29.29 623.8 sh-c-tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Gives considerable emphasis to laying off of center lines, frame lines and buttock lines on the deck of the ship; fltting and setting the horn girder in terms of these lines; the various procedures used to shift the girder up and down, over and crosswise and to the deflnition of such words as camber, wooden batten and spiel line FILING AND INSTALLING CHOCKS. Castle 1944 15min sd $27.15 623.8 tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Shows how chocks are used In machinery installation; how they are surfaced smoothly and accurately, and adjusted to given tolerances; how a machine is leveled by using chocks; how Prussian blue and chalk are used for adjusting chocks; how feeler gages are used In chock installation; and how foundation and chocks are drilled for bolts HOW TO CHECK AND SURFACE FOUNDATIONS. Castle 1944 19min sd $30.74 623.8 tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Shows how to lay out foundations for machmery mstallations; how to establish centers of holes for drilling; how to drill bolt holes m foundations to blueprint speciflcations; how to align machines accurately on foundations; and how auxiliary machine Installations are checked INNERBOTTOM SECTION: SUB-ASSEMBLY OF A CLOSED FLOOR; SUB-ASSEMBLY OF AN OPEN FLOOR. Castle 1942 18min sd $30.01 623.8 sh-c-tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Deals largely with the work of the shipfitter. Defines vertical keel, flat keel, keelson, floors, stiffener, battle plate, and universal mold; explaining the role of these elements of the ship construction in strengthening the ship; and demonstrating the laying off of the closed floor from a template, locating and fitting a vertical stiffener, a flat bar ring for lightening hole, and a face plate INNERBOTTOM: SETTING UP FLOORS AND LONGITUDINALS. Castle 1942 18min sd $30.01 623.8 sh-c-tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Deals with the cooperative work of shipfltter and shipwright in setting and fitting a closed floor in an innerbottom section. It provides an explanation and definition of keel, longitudinal side girders, floors, fairing, and declivity; shows the fairing, setting, and fltting of a floor in an innerbottom section and demonstrates the procedures used in checking the declivity angle, the use of wedges and spur shores, the use of bar and turn buckles to align the keel and emphasizes the use of the blueprint in all shipbuilding work INSTALLING VALVES AND STRAINER ON SEA CHEST. Castle 1944 13min sd $22.88 623.8 tr-ad Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Shows how studs are ordered for tapped flanges; how studs are driven; how driven studs are checked for accuracy of driving; how valves are Installed on sea chests; and how strainer is prepared for installation and installed on sea chest INSTALLING VALVES IN ENGINE ROOM SYSTEMS: PART I. Castle 12min sd $22.88 623.8 sh-c-tr Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Identifies principal engine-room units; traces the cycle of steam in engine-room sysstems; and shows the functions of the gate valve, globe valve, angle valve, swing-check valve and lift-check valve INSTALLING VALVES IN ENGINE ROOM SYSTEMS: PART II. Castle IGmin sd $27.88 623.8 sh-c-tr Guide Produced by U.S. Office of Education. Accompanying fllmstrip $1 Shows how to install tlie globe valve in the main steam line of a ship; typical installations of the gate, angle and swing-check valves; how to install flanged valves; how to install valves with threaded flttings; and how to instali a threaded valve where clearance is limited LAYING OFF THE BOUNDARY, STIFFENERS, WATER LINES AND BUTTOCK LINES. Castle 1944 18min sd $30.01 623.8 sh-c-tr-ad Guide A U.S. Office of Education production. Accompanying fllmstrip $1 Locating the center lines of a ship; how to strike and check water and buttock lines; how to fasten templates with mold loft clamps and dog them down, mark them with soap stone, trim excess metal, and center punch marks to guide the burner Shows how to locate stiffeners using templates; how to use dogs and wedges in flattening a bulged portion of the bulkhead to 457