We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
CATEGORY INDEX ORD
For synopsis see page No.
Power Train for Tank M4, Disassembly and Assembly — Part VII: As
sembly of Transmission FS 9-61 (1943— Film Reference) ____________________________________ 439
Power Train for Tank M4, Disassembly and Assembly — Part VIII: Disas
sembly and Assembly of Input Shaft and Countershaft FS 9-62 (1943— Film Reference) ____________________________________ 439
Power Train for Tank M4, Disassembly and Assembly — Part IX: Disas
sembly and Assembly of Output Shaft FS 9-63 (1943— Film Reference) ____________________________________ 439
Power Train for Tank M4, Disassembly and Assembly — Part X : Disas
sembly and Assembly of Transmission Subassemblies FS 9-64 (1943— Film Reference) ______________________ :._____ ....... 439
The Synchromesh Transmission— Principles of Operation
TF £-1213 (25 min— 1943— Film Reference) ____________________ li'.fC 364
Hydrovac Power Brakes — Principles of Operation
TF 9-1246 (9 min— 1943— Film Reference) _____________________ ...... 364
Servicing the Zero-lash Hydraulic Valve Lifter
TF 9-1283 (26 min-1943-Film Reference). ...L9/:.!".1.'.1!'^^^^,, 364
The Half Track Vehicle — Part I: Care and Maintenance of Endless Band
Tracks and Bogie Wheels TF 9-1126 (29 min— 1943— Film Reference) __________________________ 363
The Half Track Vehicle— Part III: Removal and Installation of Bogie
Wheels TF 9-1127 (13 min— 1943— Film Reference) ____________________ ...... 363
Elementary Principles of Torque
TF 9-1286 (16 min— 1944— Film Reference) __________ J-V™----L-- 365
Torque Converter— Principles of Operation
TF 9-1427 (20 min-1945) ____________________ . _____________ ^^± 366
The Oil Gear Hydraulic Traversing Mechanism — Principles of Operation
TF 9-1376 (21 min— 1944) _________________________________________ 366
Before, During, and After Operation Maintenance, Medium Tank
TF 9-1805 (31 min— 1953— Film Reference) _______ --.lT™-..: 367
The Controlled Differential— Principles of Operation
TF 9-1285 (21 min— 1944— Film Reference) ________ _______ _lJ^.!l...Ll 364
Medium Wrecker Truck M-62— Part I— Preparation for Lifting
TF 17-2494 (10 min— 1957— Film Reference) ___________ _ _____________ 397
Tank Recovery Vehicle M-74 — Part I — Preparing for Boom Operation
TF 17-2496 (7 min— 1957— Film Reference) __________________________ 397
Tank Recovery Vehicle M-74— Part II— Rigging for Live Boom Operation
TF 17-2497 (7 min— 1957— Film Reference) __________________________ 397
Tank Recovery Vehicle M-74— Part III— Power Plant Removal
TF 17-2498 (5 min— 1957— Film Reference) ____________________ ...... 397
Medium Wrecker Truck M-62 — Part II — Power Plant Removal
TF 17-2495 (7 min— 1957— Film Reference) __________________________ 397
Daily Crew Maintenance — Armored Personnel Carrier M-59
TF 17-2538 (28 min— 1 957— Film Reference) ______ _ __________________ 398
Preparation of Vehicles for Deep Water Fording — Part I — Wheel Vehicles
TF 9-2541 (24 min— 1957— Film Reference) ....... . __________________ 375
121