We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
NUMERICAL INDEX
MF No. 55-8531 Cooper Bessmer Diesel Engine Fuel Injection Systems
Operation of fuel injection system — Examination of fuel pump — Fuel delivery and pressure (14 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command— From Navy Film MN 46-B).
55-8532 Progressive Maintenance Diesel Propulsion Engine
Disassembly of main bearing, inspection and cleaning of bearing shells — Reassembly of bearing (17 min — 1956 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN209D).
55-8533 Gray Marine Diesel Goes to War
Twenty-two step procedure for starting new engine or after an inactive period of a week (14 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command— Commercial Adaptation).
55-8534 Gray Marine Diesel Goes to War — Service and Maintenance
Service and maintenance after 10, 20, 50, 150, 250, and 1,000 hours of continuous running (25 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command— Commercial Adaptation) .
55-8535 Gray Marine Diesel — GM Unit Injector — Removal and Replacement
Removal of defective injector — Replacement with spare — Timing and equalizing (12 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — Commercial Adaptation) .
55-8536 Gray Marine Diesel— GM Unit Injector— Cleaning and Repairing
Disassembly, cleaning, inspecting and repair of injector and check valve, popping injector test (25 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command— Commercial Adaptation) .
55-8537 Making a Wire Template
Full-scale drawing and procedures for bending template (19 min — 1955— From Navy Film MN 2337-B).
55-8538 Making a Hot Bend
Complete process, from selecting pipe and packing with sand, to heating and bending (19 min— 1955— From Navy Film MN 2337C).
55-8539 General Motors Diesel Engine Unit Injector — Maintenance
Disassembly, cleaning, and inspection of parts — Lapping of check valves (18 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — 'From Navy Film MN 2769 A).
-fiioCJ fiv ' -O'j ' ' • >-'
55-8540 General Motors Diesel Engine Unit Injectors — Disassembly and
Assembly Model 278
Disassembly and reassembly procedures — Timing of rack — Testing assembled injector (18 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 2769B).
291