Index of Army motion pictures, film strips, slides, and phono-recordings (1959)

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

NUMERICAL INDEX TFNo. 44-2165 Nike I Underground Installation— Part II Section Drill Duties of section crew during the White Alert, Yellow Alert, Blue Alert, and Red Alert — Reload procedures illustrated (33 min — 1956 — FOR OFFICIAL USE ONLY— Film Reference). 44-2166 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part I — Acquisition Radar (U) (18 min— 1957— Film Reference— Film is classified CONFIDENTIAL-Modified Handling Authorized). 44-2167 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part II — Target Tracking Radar Preenergizing checks — Energizing and deenergizing procedure under normal conditions, and deenergizing in an emergency (12 min — 1957 — Film Reference— FOR OFFICIAL USE ONLY). 44-2168 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part III — Missile Tracking Radar Preenergizing checks — Ventilation and temperature control — Energizing and deenergizing during normal operation and deenergizing in an emergency (11 min — 1957 — Film Reference — FOR OFFICIAL USE ONLY). 44-2169 44-2170 44-2171 44-2172 -7.5 44-2173 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part IV — Computer Preenergizing checks — Ventilation and temperature control — Energizing procedure during normal operation — Deenergizing during normal and emergency operation (8 min — 1957 — Film Reference — FOR OFFICIAL USE ONLY). NIKE AJAX Battery, The Ground-Guidance Equipment Operation of the Personnel Heating and Ventilating System Proper operation and adjustment for the heating, cooling, and ventilating systems of the NIKE AJAX Trailers on AC power under normal conditions — During an emergency, the procedures for operating on batteries (9 min— 1957— Film Reference— FOR OFFICIAL USE ONLY). NIKE AJAX Battery, Emergency Energizing Checks and Adjustments—Part III— Computer (U) . (20 min — 1958 — Film Reference — Distribution limited to Army Film and Equipment Exchanges in CONUS and OS — Film is classified CONFIDENTIAL— Modified Handling Authorized). NIKE AJAX Battery, Emergency Energizing Checks and Adjustments — Part I — Target Tracking Radar Energizing the target tracking radar during emergency operation — Ventilation and temperature control, preliminary and emergency checks — Sum zero, angle sensitivity, collimation, noise balance, and range zero (17 min— 1957— Film Reference— FOR OFFICIAL USE ONLY). NIKE AJAX Battery, Emergency Energizing Checks and Adjustments—Part II— Missile Tracking Radar (U) (26 min— 1957— Film Reference— Film is classified CONFIDENTIAL). 419