We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
NUMERICAL INDEX
TFNo.
44-2165 Nike I Underground Installation— Part II Section Drill
Duties of section crew during the White Alert, Yellow Alert, Blue Alert, and Red Alert — Reload procedures illustrated (33 min — 1956 — FOR OFFICIAL USE ONLY— Film Reference).
44-2166 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part I — Acquisition Radar (U)
(18 min— 1957— Film Reference— Film is classified CONFIDENTIAL-Modified Handling Authorized).
44-2167 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part II — Target Tracking Radar
Preenergizing checks — Energizing and deenergizing procedure under normal conditions, and deenergizing in an emergency (12 min — 1957 — Film Reference— FOR OFFICIAL USE ONLY).
44-2168 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part III — Missile Tracking Radar
Preenergizing checks — Ventilation and temperature control — Energizing and deenergizing during normal operation and deenergizing in an emergency (11 min — 1957 — Film Reference — FOR OFFICIAL USE ONLY).
44-2169
44-2170
44-2171
44-2172
-7.5
44-2173
NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part IV — Computer
Preenergizing checks — Ventilation and temperature control — Energizing procedure during normal operation — Deenergizing during normal and emergency operation (8 min — 1957 — Film Reference — FOR OFFICIAL USE ONLY).
NIKE AJAX Battery, The Ground-Guidance Equipment Operation of the Personnel Heating and Ventilating System
Proper operation and adjustment for the heating, cooling, and ventilating systems of the NIKE AJAX Trailers on AC power under normal conditions — During an emergency, the procedures for operating on batteries (9 min— 1957— Film Reference— FOR OFFICIAL USE ONLY).
NIKE AJAX Battery, Emergency Energizing Checks and Adjustments—Part III— Computer (U) .
(20 min — 1958 — Film Reference — Distribution limited to Army Film and Equipment Exchanges in CONUS and OS — Film is classified CONFIDENTIAL— Modified Handling Authorized).
NIKE AJAX Battery, Emergency Energizing Checks and Adjustments — Part I — Target Tracking Radar
Energizing the target tracking radar during emergency operation — Ventilation and temperature control, preliminary and emergency checks — Sum zero, angle sensitivity, collimation, noise balance, and range zero (17 min— 1957— Film Reference— FOR OFFICIAL USE ONLY).
NIKE AJAX Battery, Emergency Energizing Checks and Adjustments—Part II— Missile Tracking Radar (U)
(26 min— 1957— Film Reference— Film is classified CONFIDENTIAL).
419