We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
CATEGORY INDEX ORD
For synopsiB nee page No.
Power Train for Tank M4, Disassembly and Assembly — Part VII: Assembly of Transmission
FS 9-61 (1943— Film Reference) 439
Power Train for Tank M4, Disassembly and Assembly — Part VIII: Disassembly and Assembly of Input Shaft and Countershaft
FS 9-62 (1943— Film Reference) 439
Power Train for Tank M4, Disassembly and Assembly — Part IX: Disassembly and Assembly of Output Shaft
FS 9-63 (1943— Film Reference) 439
Power Train for Tank M4, Disassembly and Assembly — Part X: Disassembly and Assembly of Transmission Subassemblies
FS 9-64 (1943— Film Reference) 439
The Synchromesh Transmission — Principles of Operation
TF 9-1213 (25 min— 1943— Film Reference) 364
Hydrovac Power Brakes— Principles of Operation
TF 9-1246 (9 min— 1943— Film Reference) 364
Servicing the Zero-lash Hydraulic Valve Lifter
TF 9-12S3 (26 min— 1943— Film Reference) 364
The Half Track Vehicle — Part I: Care and Maintenance of Endless Band Tracks and Bogie Wheels
TF 9-1126 (29 min— 1943— Film Reference) 363
The Half Track Vehicle — Part III: Removal and Installation of Bogie Wheels
TF 9-1127 (13 min— 1943— Film Reference) 363
Elementary Principles of Torque
TF 9-12S6 (16 min— 1944— Film Reference) 365
Torque Converter— Principles of Operation
TF 9-1427 (20 min— 1945) ...... 366
The Oil Gear Hydraulic Traversing Mechanism — Principles of Operation
TF 9-1376 (21 min— 1944) 366
Before, During, and After Operation Maintenance, Medium Tank
TF 9-1805 (31 min— 1953— Film Reference) 367
The Controlled Differential — Principles of Operation
TF 9-1285 (21 min— 1944— Film Reference) 364
Medium Wrecker Truck M-62 — Part I — Preparation for Lifting
TF 17-2494 (10 min— 1957— Film Reference) 397
Tank Recovery Vehicle M-74 — Part I — Preparing for Boom Operation
TF 17-2496 (7 min— 1957— Film Reference) 397
Tank Recovery Vehicle M-74 — Part II — Rigging for Live Boom Operation
TF 17-2497 (7 min— 1957— Film Reference) 397
Tank Recovery Vehicle M-74 — Part III — Power Plant Removal
TF 17-2498 (5 min— 1957— Film Reference) 397
Medium Wrecker Truck M-62 — Part II — Power Plant Removal
TF 17-2495 (7 min— 1957— Film Reference) 397
Daily Crew Maintenance — Armored Personnel Carrier M-59
TF 17-2538 (28 min— 1957— Film Reference) -.. 398
Preparation of Vehicles for Deep Water Fording — Part I — Wheel Vehicles
TF 9-2541 (24 min— 1957— Film Reference) o75
121