Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

CATEGORY INDEX ORD For synopsiB nee page No. Power Train for Tank M4, Disassembly and Assembly — Part VII: Assembly of Transmission FS 9-61 (1943— Film Reference) 439 Power Train for Tank M4, Disassembly and Assembly — Part VIII: Disassembly and Assembly of Input Shaft and Countershaft FS 9-62 (1943— Film Reference) 439 Power Train for Tank M4, Disassembly and Assembly — Part IX: Disassembly and Assembly of Output Shaft FS 9-63 (1943— Film Reference) 439 Power Train for Tank M4, Disassembly and Assembly — Part X: Disassembly and Assembly of Transmission Subassemblies FS 9-64 (1943— Film Reference) 439 The Synchromesh Transmission — Principles of Operation TF 9-1213 (25 min— 1943— Film Reference) 364 Hydrovac Power Brakes— Principles of Operation TF 9-1246 (9 min— 1943— Film Reference) 364 Servicing the Zero-lash Hydraulic Valve Lifter TF 9-12S3 (26 min— 1943— Film Reference) 364 The Half Track Vehicle — Part I: Care and Maintenance of Endless Band Tracks and Bogie Wheels TF 9-1126 (29 min— 1943— Film Reference) 363 The Half Track Vehicle — Part III: Removal and Installation of Bogie Wheels TF 9-1127 (13 min— 1943— Film Reference) 363 Elementary Principles of Torque TF 9-12S6 (16 min— 1944— Film Reference) 365 Torque Converter— Principles of Operation TF 9-1427 (20 min— 1945) ...... 366 The Oil Gear Hydraulic Traversing Mechanism — Principles of Operation TF 9-1376 (21 min— 1944) 366 Before, During, and After Operation Maintenance, Medium Tank TF 9-1805 (31 min— 1953— Film Reference) 367 The Controlled Differential — Principles of Operation TF 9-1285 (21 min— 1944— Film Reference) 364 Medium Wrecker Truck M-62 — Part I — Preparation for Lifting TF 17-2494 (10 min— 1957— Film Reference) 397 Tank Recovery Vehicle M-74 — Part I — Preparing for Boom Operation TF 17-2496 (7 min— 1957— Film Reference) 397 Tank Recovery Vehicle M-74 — Part II — Rigging for Live Boom Operation TF 17-2497 (7 min— 1957— Film Reference) 397 Tank Recovery Vehicle M-74 — Part III — Power Plant Removal TF 17-2498 (5 min— 1957— Film Reference) 397 Medium Wrecker Truck M-62 — Part II — Power Plant Removal TF 17-2495 (7 min— 1957— Film Reference) 397 Daily Crew Maintenance — Armored Personnel Carrier M-59 TF 17-2538 (28 min— 1957— Film Reference) -.. 398 Preparation of Vehicles for Deep Water Fording — Part I — Wheel Vehicles TF 9-2541 (24 min— 1957— Film Reference) o75 121