Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

NUMERICAL INDEX MF No. 55-8541 55-8542 55-8543 55-8544 55-8545 55-8546 55-8547 55-8548 55-8549 General Motors 1&-278A Diesel Engine — Disassembly Inspection of blower rotors and jiistons — Removal of heads of wear ridge, connecting rod bearing — Pulling of 1 piston (35 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707A). General Motors 16-278A Diesel Engine — Bearings Removal of main bearing — Inspection, "miking" and installation of bearing shells (10 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707B). General Motors 16-278A Diesel Engine — Part I — Reassembly Installation of liner, piston assembly, cylinder head and rocker level assembly (22 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation CommaDd — From Navy Film MN 3707C). General Motors 16-278A Diesel Engine — Part II— ReassemblyHead Installation of injector and controls, valve bridges and rocker shaft — Assembly and timing of injector and exhaust (26 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707D). General Motors 16-278A Diesel Engine — Part I— Bench Work Removal of valves, over speed trip assembly, transfer block and check valve (12 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707E). General Motors ie-278A Diesel Engine — Part II— Bench Work Cleaning and inspection head — "miking" guides and valves — Resurfacing and lapping valves (19 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command— From Navy Film MN 3707F). General Motors 16-278A Diesel Engine — Part III — Bench Work Installation of valves, over speed trip, transfer block — Testing valve and relief valve assembly — Starting air check valve (12 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707G). General Motors 1G-278A Diesel Engine— Part IV— Bench Work Disassembly of piston — Inspection and miking of piston components— Checking ring clearance — Reassembly of piston and rod and inspection — Miking of liner (26 min — 1956 — Distribution to central film and equipment exchanges in CONUS and Transportation Command—From Navy Film MN3707H). Servicing the Zero Lash Valve Adjusters in Diesel Engines Operation, maintenance, and repair of valve (37 min — 1955 — Distribution to central film and e(|uipn>ont exchangeH in CONUS and Transpijrtation Command — Commercial Adaptation). 292