We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
NUMERICAL INDEX
MF No. 55-8541
55-8542
55-8543
55-8544
55-8545
55-8546
55-8547
55-8548
55-8549
General Motors 1&-278A Diesel Engine — Disassembly
Inspection of blower rotors and jiistons — Removal of heads of wear ridge, connecting rod bearing — Pulling of 1 piston (35 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707A).
General Motors 16-278A Diesel Engine — Bearings
Removal of main bearing — Inspection, "miking" and installation of bearing shells (10 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707B).
General Motors 16-278A Diesel Engine — Part I — Reassembly
Installation of liner, piston assembly, cylinder head and rocker level assembly (22 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation CommaDd — From Navy Film MN 3707C).
General Motors 16-278A Diesel Engine — Part II— ReassemblyHead
Installation of injector and controls, valve bridges and rocker shaft — Assembly and timing of injector and exhaust (26 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707D).
General Motors 16-278A Diesel Engine — Part I— Bench Work
Removal of valves, over speed trip assembly, transfer block and check valve (12 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707E).
General Motors ie-278A Diesel Engine — Part II— Bench Work
Cleaning and inspection head — "miking" guides and valves — Resurfacing and lapping valves (19 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command— From Navy Film MN 3707F).
General Motors 16-278A Diesel Engine — Part III — Bench Work
Installation of valves, over speed trip, transfer block — Testing valve and relief valve assembly — Starting air check valve (12 min — 1955 — Distribution to central film and equipment exchanges in CONUS and Transportation Command — From Navy Film MN 3707G).
General Motors 1G-278A Diesel Engine— Part IV— Bench Work
Disassembly of piston — Inspection and miking of piston components— Checking ring clearance — Reassembly of piston and rod and inspection — Miking of liner (26 min — 1956 — Distribution to central film and equipment exchanges in CONUS and Transportation Command—From Navy Film MN3707H).
Servicing the Zero Lash Valve Adjusters in Diesel Engines
Operation, maintenance, and repair of valve (37 min — 1955 — Distribution to central film and e(|uipn>ont exchangeH in CONUS and Transpijrtation Command — Commercial Adaptation).
292