We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
NUMERICAL INDEX
TF No.
9 1992
9-2007
9-2026
9-2027
9-2028
9-2029
9-2030
9-2031
9-2045
9-2046
9-2050
9-2052
9-2053
Hydraulic Controls in the Hydramalic Transmission
Basic shifting patterns of hydramalic transmission — Principles and applications of up-shifting and down-shifting (26 min — 1955 — Film Reference) . Disposal of Unusable Ammunition and Explosives — Part 1: General
Principles and Disposal at Sea
Rea'ion and methods for disposal of ammunition and exploeives at pea (10 min — 1943 — Film Reference).
Care and Use of Hand Tools — Part I: Wrenches
Advantages and uses of various wrenches — Dangerous and incorrect practices — Resultant damages (19 min — 1943 — Film Reference).
Care and Use of Hand Tools — Part H: Pliers and Screw Drivers
Proper use of pliers and screw drivers — Safety precautions (14 min — 1943 — Film Reference).
Care and Use of Hand Tools— Part HI: Chisels
Types of cold chisels — Correct use — Techniques and safety precautions (12 min — 1943 — Film Reference).
Care and Use of Hand Tools — Part IV: Hammers
Correct use and care of hammers — Ball, straight, cross peen, sledge, and claw hammers (11 min — 1943 — Film Reference).
Care and Use of Hand Tools — Part V: Bars, Punches, and Drifts
Common misuse of bars, punches, and drifts — Specific purpose and correct use (14 min — 1943 — Film Reference).
Care and Use of Hand Tools — Part VI: Hacksaws
Proper and improper use of hacksaw — Types of frames and uses (18 min— 1943— Film References).
Field Repair of Gun, 155-mm MlAI and Carriage, Gun, 155-ram, Ml
Repairs of 155-mm gun — Contact parties — Field shop in operation (31 min— 1944— Film Reference).
Field Repair of Howitzer, 105-mm, M2A1, and Carriage, Howitzer, 105-mm, M2
Repairs on 105-mm howitzer — Use of tools in field (25 min — 1944 — Film Reference).
Howitzer, 105-mm, M2A1, and Carriage M2— Principles of Operation
Characteristics and adaptability of howitzer — Parts — Firing cycle (21 min— 1944— Film Reference).
Handling and Transporting Aerial Bombs— Part I: 100-. 250-. and
500-Pound Bombs
Approved method of loading — Finning and fuzing— Unloading and returning unused bombs from plane to revetment (35 min — 1944 — Film Reference). Handling and Transporting Aerial Bombs— Part II: 1,000-. 2.000-.
and 4,000-Pound Bombs
Approved methods of loading and unloading — Use of bomb lift truck M22 for 4,000-i)oun(l bombs — Finning and fuzing (25 min— 1944 — Film Reference).
370