Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

ENGRS CATEGORY INDEX For synopsU aee page No. Operation Noah MF 45-8615 (29 min— 1956) -. 298 TVA Town MF 61-8043 (30 min— 1952 — Commercial Adaptation) 313 Yuma Test Station Facilities MF 38-7917 (17 min— 1953— Color) 292 Field Airdromes FB 5-207 (12 min— 1945— Film Reference) 288 Rat Problem, The TF 8-1669 (25 min— 1950 — Film Reference) 374 Habits and Characteristics of the Rat — Part I: The Norway Rat TF 8-1670 (28 min— 1950— Film Reference) 374 Habits and Characteristics of the Rat— Part II: The Roof Rat TF 8-1671 (13 min— 1950— Film Reference) -- 374 Sanitation Techniques in Rat Control TF 8-1672 (21 min— 1950— Film Reference) 374 Practical Rat Control — Ratproofing TF 8-1673 (19 min— 1950— Film Reference) 374 Practical Rat Control— Rat Killing TF 8-1674 (37 min— 1951— Film Reference) 374 Rat Ectoparasite Control TF 8-1675 (12 min— 1951— Film Reference) 374 Removing and Installing a Compressor or Condenser MF 5-7647 (17 min — 1950 — From Office of Education Film No. 442) 239 Adjusting and Checking the Expansion Valve MF 5-7649 (22 min— 1950— From Office of Education Film No. 444) 239 Adjusting and Repairing the Thermo Expansion Valve MF 5-7653 (12 min— 1950— From Office of Education Film No. 448) 240 Servicing Water Cooled Condensers MF 5-7656 (12 min— 1950 — From Office of Education Film No. 451) 240 Checking the Electrical System MF 5-7651 (18 min — 1950 — From Office of Education Film No. 446) 239 Maintenance of a Petroleum Distribution System TF 10-2595 (44 min— 1958— Film Reference) 395 Military Pipeline Operations — Part I — Laying Pipelines TF 5-1862 (19 min— 1954— Film Reference) 353 Military Pipeline Operations — Part II — Installation of Pumping Stations TF 5-1863 (17 min— 1954r-Film Reference) 353 Military Pipeline Operations — Part III — Operation and Maintenance of Pipeline Systems TF 5-1864 (10 min— 1954— Film Reference) 363 Making and Repairing Tubing Connections MF 5-7657 (18 min— 1950— From Office of Education Film No. 452) 240 Construction of 10,000 Barrel Bolted Steel Tanks— Part I— Foundation, Bottom, and Sidewalls TF 5-1817 (16 min— 1954— Film Reference) -- 352 86