We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
ENGRS CATEGORY INDEX
For synopsU aee page No.
Operation Noah
MF 45-8615 (29 min— 1956) -. 298
TVA Town
MF 61-8043 (30 min— 1952 — Commercial Adaptation) 313
Yuma Test Station Facilities
MF 38-7917 (17 min— 1953— Color) 292
Field Airdromes
FB 5-207 (12 min— 1945— Film Reference) 288
Rat Problem, The
TF 8-1669 (25 min— 1950 — Film Reference) 374
Habits and Characteristics of the Rat — Part I: The Norway Rat
TF 8-1670 (28 min— 1950— Film Reference) 374
Habits and Characteristics of the Rat— Part II: The Roof Rat
TF 8-1671 (13 min— 1950— Film Reference) -- 374
Sanitation Techniques in Rat Control
TF 8-1672 (21 min— 1950— Film Reference) 374
Practical Rat Control — Ratproofing
TF 8-1673 (19 min— 1950— Film Reference) 374
Practical Rat Control— Rat Killing
TF 8-1674 (37 min— 1951— Film Reference) 374
Rat Ectoparasite Control
TF 8-1675 (12 min— 1951— Film Reference) 374
Removing and Installing a Compressor or Condenser
MF 5-7647 (17 min — 1950 — From Office of Education Film No. 442) 239
Adjusting and Checking the Expansion Valve
MF 5-7649 (22 min— 1950— From Office of Education Film No. 444) 239
Adjusting and Repairing the Thermo Expansion Valve
MF 5-7653 (12 min— 1950— From Office of Education Film No. 448) 240
Servicing Water Cooled Condensers
MF 5-7656 (12 min— 1950 — From Office of Education Film No. 451) 240
Checking the Electrical System
MF 5-7651 (18 min — 1950 — From Office of Education Film No. 446) 239
Maintenance of a Petroleum Distribution System
TF 10-2595 (44 min— 1958— Film Reference) 395
Military Pipeline Operations — Part I — Laying Pipelines
TF 5-1862 (19 min— 1954— Film Reference) 353
Military Pipeline Operations — Part II — Installation of Pumping Stations
TF 5-1863 (17 min— 1954r-Film Reference) 353
Military Pipeline Operations — Part III — Operation and Maintenance of
Pipeline Systems TF 5-1864 (10 min— 1954— Film Reference) 363
Making and Repairing Tubing Connections
MF 5-7657 (18 min— 1950— From Office of Education Film No. 452) 240
Construction of 10,000 Barrel Bolted Steel Tanks— Part I— Foundation,
Bottom, and Sidewalls TF 5-1817 (16 min— 1954— Film Reference) -- 352
86