Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

CATEGORY INDEX QM For gj/nopsis tee pane No. Operation of the 50-Galion-per-Miiiute Petroleum Dispenser TF 10-1932 (21 min— 1954 — Film Reference) _ 393 Operation of the 225-Gallon-per-Minute Petroleum Dispenser TF 10-1933 (23 min— 1954— Film Rofercncc), 393 Maintenance of a Petroleum Distribution System TF 10-2595 (44 min— 1958— Film Reference) 395 Collapsible Petroleum Containers (10,000 gallons) TF 10-2730 (17 min— 1958— Film Reference) 395 Construction of 10.000 Barrel Bolted Steel Tanks — Part I— Foundation, Bottom, and Sidewalls TF 5-1817 (16 min— 1954) 352 Construction of 10,000 Barrel Bolted Steel Tanks — Part 11— Center Support, Deck, Valves, and Vents TF 5-1898 {9 min— 1954). __ _ _ 363 Gauging and Sampling Petroleum Products TF 10-2731 (18 min— 1958— Film Reference).. 395 Operation of the Mobile Petroleum Laboratory TF 10-2208 (23 min— 1955— Film Reference) 393 Pipeline Pump Station Operations TF 10-2729 (12 min— 1958— Film Reference) 395 POL Pier Discharge Operations TF 10-2855 (18 min— 1960— Film Reference) 396 Petroleum Supply Point Operations TF 10-1742 (27 min— 1952— Film Reference)— 393 Military Pipeline Operations — Part I — Laying Pipelines TF 5-1862 (19 min— 1954— Film Reference) 353 Military Pipeline Operations — Part II — Installation of Pumping Stations TF 5-1863 (17 min— 1954) 353 Military Pipeline Operations — Part III — Operation and Maintenance of Pipeline Systems TF 5-1864 (10 min— 1954) 353 Site Selection and Movement of Quartermaster Non-Divisional Units MF 10-8722 (24 min— 1957— Film Reference) 250 Supply Problems in the Southwest Pacific FB 10-127 (40 min— 1944) 230 Extraction of Heavy Equipment from Aircraft in Flight MF 10-8727 (17 min— 1957— Film Reference) 230 Quartermaster Quality Control for Clothing and Textile Items MF 10-9021 (17 min— 1959) 250 Quartermaster Quality Control for General Supplies, and Parts MF 10-9022 (17 min— 1959) 250 Quartermaster Quality Control for Subsistence Items MF 10-9023 (18 min— 1959) 250 Classification of Quartermaster Property MF 10-8878 (7 min— 1958) 250 Materials Handling of Unit Loads MF 10-7582 (11 min— 1949— Film Reference) 249 147