We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
CATEGORY INDEX SIG
For RynopgiH see page No.
Installation and Operation of Switchboard SB-22/PT
TF 11-2755 (18 min— 1959— Film Reference) 405
Installation and Operation of Switchboard SB-86/P
TF 11-275G (27 min— 1959 Film Reference) 405
Multiple Switchboards — Installation and Operation
TF 11-1555 (24 min— 1949— Film Reference) 397
Manual Teletypewriter Operation and Procedures — Part I — Teletypewriter Operation TF 1 1-1SS2 (9 min— 1953— Film Reference) 399
Manual Teletypewriter Operation and Procedures — Part II — Teletypewriter Procedure and Preparation of Message
TF 11-1883 (16 min— 1954— Film Reference).. 399
Manual Teletypewriter Operation and Procedures — Part III — Single and Multiple Calls — Making Corrections and Repetitions
TF 1 1-1884 (8 min— 1953— Film Reference) 400
Manual Teletypewriter Operation and Procedures — ^Part IV — Maintenance and Summary TF 11-1885 (11 min— 1954— Film Reference) 400
Line-Up of Field Teletypewriters Set EE-98-A
TF 11-1839 (8 min— 1953— Film Reference) 399
The Step by Step Switch— 197 -Type Selector (Parts 1, 2, and 3)
MF 1 1-8054 (69 min — 1954— Commercial Adaptation) 252
Installation of Teletypewriter AN/PGC-1
TF 11-2525 (20 min— 1957— Film Reference) 402
Facsimile Equipment RC-120 — Part I — Theory and Description
TF 1 1-1397 (20 min— 1944— Film Reference) 397
Line-Up Procedure for Telephone Terminal AN/TCC-3 Carrier Systems
TF 11-2825 (21 min— 1959— Film Reference) 406
Introduction to Telephone Terminal AN/TCC-3 and Telephone Repeater AN/TCC-5
GF 11-41 (15 min— 1958— Film Reference) 235
Manual Telephone Central Office AN/TCC-7
GF 11-39 (18 min— 1958— Film Reference) 235
AN/TCC-7 System— Part I— Introduction to the System
GF 11-40 (15 min— 1959— Film Reference) 235
AN/TCC-7 System— Part 11— Initial Adjustments of Carrier Telephone
Terminal
TF 11-2696 (23 min— 1958— Film Reference) 404
AN/TCC-7 System— Part III— Lineup Procedures of Carrier Telephone
Terminals
TF 11-2697 (18 rain— 1958— FUm Reference) 404
The AN/TCC-7 System— Part IV— Initial Adjustment and Lineup of the
AN/TCC-8 Attended Repeater
TF 11-2861 (27 min— 1960) 407
The AN/TCC-7 System— Part V— Adjustment and Operational Test of the
AN/TCC-11 Unattended Repeater
TF 11-2862 (27 min— 1960) 407
Line-Up Procedure for Tactical Telephone Carrier Equipment
TF 11-1838 (11 min— 1953— Film Reference) 399
157