Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

NUMERICAL INDEX TF No. 5-1154 5-1155 5-1169 5-1181 5-1190 5-1193 5-1194 5-1197 5-1198 5-1226 5-1242 5-1377 5-1408 mer, and maul — Correct use and maintenance (13 min — 1943 — Film Reference). Carpentry — Part III — Sawing and Boring Principles of design of crosscut saw, ripsaw, brace, and bit — Correct use and maintenance (16 min — 1943 — Film Reference). Carpentry — Part IV — Planing and Chiseling Jack plane demonstrated, dismantled, reassembled, and blade sharpened— Correct and incorrect handling of tools (14 min — 1943 — Film Reference). Military Roads and Runways — Part I — Clearing, Grubbing, and Rock Work Preliminary clearing — Grubbing by use of explosives and mechanical means — Rock work done by "snakeholing," "mudcapping," and "blockholing" — Blasting methods used on high veritcal and low shallow rock ledges (14 min — 1943 — Film Reference). Infantry Support Raft Engineers build ponton rafts on river bank — Raft as transportation for heavy vehicles across unfordable streams (17 min — 1943 — Film Reference). Military Roads and Runways — Part II — Bases and Untreated Surfaces Improving road bases by adding proper materials for stabilization (10 min — 1943 — Film Reference). Military Roads — Part I — Road Expedients Expedient methods of road construction in marshy and sandy soils — Use of corduroy, wire mesh, and other materials (21 min — 1943 — Film Reference). Military Roads — Part II — Drainage Importance of drainage — Providing necessary crowTi — Constructing ditches and open and covered culverts (12 min — 1943 — Film Reference). Military Roads — Part V — Subgrade Preparation Planning earth-moving operations to create best possible subgrade — Mixing of sand and clay to obtain optimum subgrade — Locating subgrade to prevent failure from water — Creating artificial subgrade on marshy ground (9 min — 1943 — Film Reference). Military Roads — Part VI — Gravel and Rock Surfaces Principles of gradation — Selection of materials — Placing materials on road base (8 min — 1943 — Film Reference). The Double Apron Fence Erection of double-apron fence — Construction layout — Technique of using both reels and bobbins of barbed wire — Three basic methods of erecting a barbed wire fence (15 min — 1943 — Film Reference). Assault Boat River Crossing Coordination between infantry and engineer boat crews, using M2 assault boats (17 min — 1943 — Film Reference). Explosives and Demolitions — Bangalore Torpedo Assembly of torpedo — Characteristics and operation — Placing and setting oflF the charge — Improvising a bangalore torpedo (9 min — 1944 — Film Reference). Engineer Road Graders Operation and use of motorized and towed-type road graders — 350