NUMERICAL INDEX
TF No.
5-1154
5-1155
5-1169
5-1181
5-1190
5-1193
5-1194
5-1197
5-1198
5-1226
5-1242
5-1377
5-1408
mer, and maul — Correct use and maintenance (13 min — 1943 — Film
Reference).
Carpentry — Part III — Sawing and Boring
Principles of design of crosscut saw, ripsaw, brace, and bit — Correct use and maintenance (16 min — 1943 — Film Reference). Carpentry — Part IV — Planing and Chiseling
Jack plane demonstrated, dismantled, reassembled, and blade sharpened— Correct and incorrect handling of tools (14 min — 1943 — Film Reference).
Military Roads and Runways — Part I — Clearing, Grubbing, and Rock Work
Preliminary clearing — Grubbing by use of explosives and mechanical means — Rock work done by "snakeholing," "mudcapping," and "blockholing" — Blasting methods used on high veritcal and low shallow rock ledges (14 min — 1943 — Film Reference). Infantry Support Raft
Engineers build ponton rafts on river bank — Raft as transportation for heavy vehicles across unfordable streams (17 min — 1943 — Film Reference).
Military Roads and Runways — Part II — Bases and Untreated Surfaces
Improving road bases by adding proper materials for stabilization (10 min — 1943 — Film Reference).
Military Roads — Part I — Road Expedients
Expedient methods of road construction in marshy and sandy soils — Use of corduroy, wire mesh, and other materials (21 min — 1943 — Film Reference).
Military Roads — Part II — Drainage
Importance of drainage — Providing necessary crowTi — Constructing ditches and open and covered culverts (12 min — 1943 — Film Reference).
Military Roads — Part V — Subgrade Preparation
Planning earth-moving operations to create best possible subgrade — Mixing of sand and clay to obtain optimum subgrade — Locating subgrade to prevent failure from water — Creating artificial subgrade on marshy ground (9 min — 1943 — Film Reference).
Military Roads — Part VI — Gravel and Rock Surfaces
Principles of gradation — Selection of materials — Placing materials on road base (8 min — 1943 — Film Reference). The Double Apron Fence
Erection of double-apron fence — Construction layout — Technique of using both reels and bobbins of barbed wire — Three basic methods of erecting a barbed wire fence (15 min — 1943 — Film Reference). Assault Boat River Crossing
Coordination between infantry and engineer boat crews, using M2 assault boats (17 min — 1943 — Film Reference). Explosives and Demolitions — Bangalore Torpedo
Assembly of torpedo — Characteristics and operation — Placing and setting oflF the charge — Improvising a bangalore torpedo (9 min — 1944 — Film Reference). Engineer Road Graders
Operation and use of motorized and towed-type road graders —
350