Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

NUMERICAL INDEX TF No. 44-2164 Nike I, Underground Installation — Part I — Introduction Advantages of underground installation — Layout — Automatic and manual operation of elevator and satellite launchers — Safety factors (29 min— 1956 — Film Reference). 44-2165 NIKE I Underground Installation— Part II— Section Drill Duties of section crew during the White Alert, Yellow Alert, Blue Alert, and Red Alert — Reload procedures illustrated (33 min — 1956 — Film Reference). 44-2166 NIKE AJAX Battery, Energizing and Deenerglzing the GroundGuidance Equipment — Part I — Acquisition Radar (U) (18 min— 1957— Film Reference— Film is classified CONFIDENTIAL— Modified Handling Authorized.) 44-2167 NIKE AJAX Battery, Energizing and Deenerglzing the Ground-Guidance Equipment — Part II — Target Tracking Radar Preenergizing checks — Energizing and deenerglzing procedure under normal conditions, and deenerglzing in an emergency (12 min — 1957— Film Reference). 44-2168 NIKE AJAX Battery, Energizing and Deenergizing the GroundGuidance Equipment — Part III — Missile Tracking Radar Preenergizing checks — Ventilation and temperature control, energizing and deenergizing during normal operation, and deenergizing in an emergency (11 min — 1957 — Film Reference). 44-2169 NIKE AJAX Battery, Energizing and Deenergizing the Ground-Guidance Equipment — Part IV — Computer Preenergizing checks — Ventilation and temperature control — Energizing procedure during normal operation — Deenergizing during normal and emergency operation (8 min — 1957 — Film Reference). 44-2170 NIKE AJAX Battery, The Ground-Guidance Equipment Operation of the Personnel Heating and Ventilating System Proper operation and adjustment for the heating, cooling, and ventilating systems of the NIKE AJAX trailers on ac power under normal conditions — During an emergency, the procedures for operating on batteries (9 min — 1957 — Film Reference). 44-2174 NIKE AJAX Multi-Channel Data Recorder— Part I— Operation Describes function and operation of recorder — Features and operation of components — Adjustments for operation — Loading, recording, and unloading tape record — Safety measures — Teaching points reviewed (34 min— 1958— Film Reference— Film is FOR OFFICIAL USE ONLY). 44-2175 NIKE AJAX Multi-Channel Data Recorder— Part II— Tape Analysis (U) This film is classified CONFIDENTIAL— Modified Handling Authorized (34 min— 1958). 44-2246 NIKE I, Missile Tests, Part I— Calibration of the RF Test Set (U) (9 min — 1956 — Distribution primarily to central film and equipment exchanges in CONUS and OS and to film exchanges servicing appropriate service schools — Film Reference — Film is classified CONFIDENTIAL—Modified Handling Authorized.) 438