We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
NUMERICAL INDEX
TF No.
antenna assemblies — Missile is ready for second phase, optical adjustments (20 min — 1959 — Film Ilcfcrencc).
41-2506 Nike Hercules Sam Battery, Orientation and Synchronization — Part
II — Optical Adjustments
CoUimating telescope reticle check and telescope perpendicularity
check — Viewing telescope check and alignment — CoUimating telescope
reticle level adjustment and spirit level check and adjustment — Missile
is ready for third phase, colliuiation (25 min — 1959— Film Ilcferoiice).
44-2507 Nike Hercules Sam Battery, Orientation and Synchronization— Pari III— Collimation (U) (17 min— 1959— Film Reference — This film is classified CONFIDENTIAL.)
44-2608 Nike Hercules Sam Battery, Orientation and Synchronization — Part IV —Orientation (U)
(22 min1959— Film Reference— This film is classified CONFIDENTIAL.)
44-2509 Nike Hercules Sam Battery, Orientation and Synchronization — Part V — Parallax Corrections and Launcher Position Unit Adjustments
(U) (17 mi.i— 1959— Film Reference— This film is classified CONFIDENTIAL.)
44-2310 Nike Hercules Sam Battalion — Part I — Emplacement of the Monorail Launcher
Preemplacenient check — Hoi.sting, securing and leveling the launcher on the launching pad — Installation and leveling of loading and storage racks (19 min — 1959 — Film Reference).
44-2811 Nike Hercules Sam Battalion — Part II — Preparation of the Monorail Launcher
Visual and hydraulic preoperational checks — Operational upcycle and down checks without a round — Shutdown procedure (13 min — 1959 — Film Reference).
44-2512 Nike Hercules Sam Battalion Reload Procedures
Locking new missile onto rail — Positioning rail on launcher, checks on warhead, power supply, hydraulic pressure gauges, and voltages, plugging in squib cable (15 min — 1959 — Film Reference).
44-2313 Nike Hercules Sam Battalion, Battery Control Area, Emplacement and March Order of the Nike Hercules Acquisition Radar
Selection of emplacement site, emplacement of components forming barbette, emplacement of antenna, installation of wave guides — March Order reverse of emplacement procedures (38 min — 1959 — Film Reference).
44-2514 Nike Hercules Sam Battalion, Battery Control Area, Emplacement and March Order of Nike Hercules Track Radar
Installation of antenna leg assembly, reflector assembly, upper radom.e support arms, antenna, and power cable — Installation and inflation of radome cover (33 min — 1959 — Film Reference).
44-2615 Nike Hercules Missile — Part IV — Final Preparation of Warhead and Forward Body Sections Inspection, uncrating and installation of warhead body section; mating warhead body section with missile aft body section; attachment of missile forward body section to warhead section (27 min — 1960).
441