We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.
Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.
CATEGORY INDEX ARTY—AA For aynopaib see page No. Nike I, SAM Battalion, Preparation of the Missile— Part VI—Warhead Installation [0] TF 44-2155 (32 min—1955—Film Reference) 367 Nike I, SAM Battalion, Preparation of the Missile— Part VII—Final Preparations [0] TF 44-2156 (24 min—1955—Film Reference) 367 Nike I, SAM Battalion, Preparation of the Missile— Part VII—Routine Checks [O] TF 44-2157 (10 min—1955—Film Reference) 367 Nike I, SAM Battalion, Orientation and Synchronization— Part I—Leveling of the Tracking Radars [0] TF 44-2139 (21 min—1955—Film Reference) 365 Nike I, SAM Battalion, Orientation and Synchronization— Part II—Adjustment of the Optical System [O] TF 44-2140 (30 min—1955—Film Reference) 365 Nike I, SAM Battalion, Orientation and Synchronization— Part III—Collimation of the Tracking Radars [0] TF 44-2140 (30 min—1955—Film Reference) 365 Nike I, SAM Battalion, Orientation and Synchronization— Part III—Collimation of the Tracking Radars [O] TF 44-2141 (29 min—1956) 365 Nike I, SAM Battalion, Orientation and Synchronization— Part IV—Data Transmission Adjustments [O] TF 44-2142 (25 min—1956—Film Reference) 365 Nike I, SAM Battalion, Orientation and Synchronization— Part VI—Orientation of the Launcher Rail [0] TF 44-2163 (8 min—1956—Film Reference) 365 Nike I, SAM Battalion, Battery Control Area—Part I— Emplacement and Preparation of the Tracking Radars [O] TF 44-2144 (16 min—1955—Film Reference) 365 Nike I, SAM Battalion, Battery Control Area—Part II— Assembly of the Radar Collimation Mast [O] TF 44-2145 (30 min—1955—Film Reference) 366 Nike I, SAM Battalion, Battery Control Area—Part Ill- Adjustment and Erection of the Radar Collimation Mast Assembly [0] TF 44-2146 (15 min—1955—Film Reference) 366 Nike I, Underground Installation—Part I—Introduction [O] TF 44-2164 (29 min—1956—Film Reference) 367 Nike I, Underground Installation—Part II—Section Drill [O] TF 44-2165 (33 min—1956—Film Reference) 367 Nike I, SAM Battalion, Launching Area—Part I—Emplacement of the Launching Equipment [O] TF 44-2147 (28 min—1955--Film Reference) 366 Nike I, SAM Battalion, Launching Area—Part II—Installation and Checks of Launcher Equipment [0] TF 44-2148 (24 min—1955—Film Reference) 366 Nike I, SAM Battalion, Launching Area—Part III—Reload Procedures and Drill for the Launcher-Loader [O] TF 44-2149 (16 min—1956—Film Reference) 366 AGO 10118B 29