Index of Army motion pictures, film strips, slides, and phono-recordings ([n.d.])

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

ENGR CATEGORY INDEX For aynopais see i>aae No. Steel Treadway Bridge M2—Part II: Raft and Fixed Bridge Construction TF 5-1365 (12 min—1944—Film Reference) _. 294 Bridge-Panel Bailey Type M-2—Part I—Site Preparation and Layout TF 5-1996 (17 min—1955—Film Reference) 298 Bridge-Panel Bailey Type M-2—Part II—Basic Construction TF 5-1997 (37 min—1955—Film Reference) — - 298 Bridge-Panel Bailey Type M-2—Part III—Multi-Story Con- struction TF 5-1998 (25 min—1955—Film Reference) 298 The Bailey Bridge in Combat FB 5-185 (13 min—1945—Film Reference) 185 The Floating Bridge M4—Part II: Assembly of the Bridge TF 5-1441 (22 min—1945—Film Reference) 295 The Floating Bridge M4—Part III: Rafts TF 5-1442 (lOmin—1945—Film Reference) 295 Bridge, Floating, Pneumatic Float, Class 60, Steel Super- structure—Part I — Bridge Assembly TF 5-2106 (35 min—1956—Film Reference) 298 Bridge, Floating Pneumatic Float, Class 60, Steel Super- structure—Part II — Rafts TF 5-2107 (16 min—1955—Film Reference) 298 Bridge, Floating, Pneumatic Float, Class 60, Steel Super- structure—Part III — Fixed Spans TF 5-2108 (17 min—1956—Film Reference) 298 Aluminum Floating Footbridge TF 5-2105 (19 min—1955—Film Reference) 298 Timber Trestle Bridge TF 5-2103 (17 min—1955—Film Reference) 298 Handling of Boats and Pontons in Swift Currents TF 5-1414 (13 min—1945—Film Reference) 294 Operation of Rafts TF 5-1415 (15min—1945—Film Reference) 295 Infantry Support Raft TF 5-1181 (17 min—1943—Film Reference) 293 Fixed Bridge Construction FB 5-113 (13 min—1944—Film Reference) 185 Fixed Bridge Construction and Repair in the CBI FB 5-192 (12 min—1945—Film Reference) 186 River Crossing Operations in the CBI FB 5-201 (14 min—1945—Film Reference) 186 Steel Treadway Bridge M2—Part I: Floating Bridge FS 5-59 (1944) 374 Steel Treadway Bridge M2—Part II: Rafting FS 5-60 (1944) 374 Floating Bridge M5—Part I: Equipment and Launching of Pontons FS 5-72 (1945) 374 Floating Bridge M4—Part II: Assembly of End Sections and Raft Sections FS 5-73 (1945) 374 58 AGO 10118B