Radio Broadcast (Nov 1923-Apr 1924)

Record Details:

Something wrong or inaccurate about this page? Let us Know!

Thanks for helping us continually improve the quality of the Lantern search engine for all of our users! We have millions of scanned pages, so user reports are incredibly helpful for us to identify places where we can improve and update the metadata.

Please describe the issue below, and click "Submit" to send your comments to our team! If you'd prefer, you can also send us an email to mhdl@commarts.wisc.edu with your comments.




We use Optical Character Recognition (OCR) during our scanning and processing workflow to make the content of each page searchable. You can view the automatically generated text below as well as copy and paste individual pieces of text to quote in your own work.

Text recognition is never 100% accurate. Many parts of the scanned page may not be reflected in the OCR text output, including: images, page layout, certain fonts or handwriting.

A Two-Stage Amplifier for Your Receiver 259 — s. iii 7v '■» D3Z I" DRILL A/a. 27 ■CLE ' 3Z 3E (V f t )— -© — < 1 1 1 1 1 | 1 DETAILS OF SHELF SUPPORT with the positive side to the minus side of the A and B batteries. They in turn are grounded to the frame, thus bringing the transformer cores to ground potential. To check the B battery circuit it is well to connect the A battery to the B battery binding post and see if by chance the tubes light, showing that you have made a mistake. This may save the life of a tube which might otherwise be burned out. PANEL LAYOUT Laying off 8" from the left and 2\" from the right leaves a piece about \\" in between. Saw line D first. In sawing line E keep the saw well to the right of the line and thus allow some leaway for squaring up the edge of the front panel with a file. It will be found that the pieces B and C will not actually measure \\" and 2\" respectively due to the loss of material caused by the sawing